  • Mechanical and Electrical fully co-ordinated design
  • Design of bespoke, fabricated steel framework for roof mounted external condenser plant
  • Full installation of central, fully automated smoke ventilation system
  • CFD (Computational Fluid Dynamics) modelling completed used to help demonstrate how the fire safety strategy of the building would work
  • Complete Dry Riser installation with outlet on each floor for use in the event of a fire
  • Complete installation of ducted fan coil units throughout the floors to provide heating and cooling to the office space
  • Domestic water services and drainage to various tea points across the floors
  • Flat oval ductwork installed, to ensure the aesthetic look of the office areas are achieved as all services exposed
  • Full co-ordination of lift and shifting AHU into existing basement plant area with limited access
  • Full co-ordination comprising of sections and 3D visuals to ensure the plant installation within the plantroom would fit in the space provided
  • Integrated Building Management Controls providing full remote control/visuals to clients app on smart device
  • The entire build was undertaken in a phased manor, to enable the main contractor to proceed with closing up the building alongside works being undertaken to ensure the programme was not compromised
Home Page contact page
prestigious refurbishment project in Clerkenwell Green

contact us to find out more about our services

Our experience and industry partnerships means we have the expertise to fulfil your project from initial briefing to project completion.